Spent the morning trimming most of the ‘pads’ between the trenches down to the correct height (the sand pad varied in height by 20-30mm, and I’d – wisely? – taken a low point as my baseline) before these two blokes invaded the block and undid most of my good work: Plumbing pre-lay nearly fell in a hole straight away, when we discovered that I’d sent them an old copy of the plans before Neve had worked her magic on the bathroom – so all of…Continue Reading “The invasion of the plumbers”