Put together the plant room doors, just to get the hole closed up. These aren’t pretty by any means – timber frame, cement sheet cladding:
![](http://juffyhouse.pdowling.id.au/wp-content/uploads/2022/01/image-8.png)
….but they’re solid enough and will get the job done.
Also got some more internal wall-stuffing done, now that the plumbing and electrical is done. The 2nd bedroom is now closed up, and the laundry is basically done as well. I used a sheet of villaboard as the backing for the laundry area:
![](http://juffyhouse.pdowling.id.au/wp-content/uploads/2022/01/image-9.png)
to make it easier to mount cupboards and tiles, rather than trying to get perfectly flat render to tile over. In theory I can match the render up with the tiles…we’ll see how that goes. 🙂
Other internal walls…..2nd bedroom:
![](http://juffyhouse.pdowling.id.au/wp-content/uploads/2022/01/image-10.png)
![](http://juffyhouse.pdowling.id.au/wp-content/uploads/2022/01/image-15.png)
Hallway:
![](http://juffyhouse.pdowling.id.au/wp-content/uploads/2022/01/image-16.png)